Montlake

蒙特莱克小学现代化和扩建项目

项目简介

现有的两层教学楼是指定的西雅图地标. 这座22,447平方英尺的标志性建筑将进行翻新和现代化改造.

The project design includes renovations to the existing landmarked building and construction of a new 3-story addition.

专为当前和未来的学生

一旦完成, the school will provide an equitable learning space for up to 500 K-5 elementary 学生. It will meet district educational standards while reflecting the input from the school design advisory team comprised of school leaders, 学生, 父母, 社区成员.

The addition will be set into the site with a roofline height that respects the scale of the current school building and neighborhood.

  • 可访问性 will be built in throughout the campus to ensure everyone can attend or visit the school.
  • Classrooms will be arranged with a variety of shared learning spaces to support academic success for every student.

安全与保障

学生, 家庭, and visitors will be welcomed through a new entry plaza on the northeast side of the of the addition.

游客将通过一个单一的入口进入, the secure main entrance that invites them into the administrative office for check-in before entering the school.

室外连接

New outdoor learning spaces will be constructed on the east side of the landmarked school building. 中央游戏庭院将提供与花园露台的直接连接. 二楼的学习和游戏平台将直接连接到教室.

建设可持续发展的未来

可持续设计的特点将建立在工作朝着
清洁能源和可再生资源的地区目标, including a high-performing building envelope and the installation of solar panels.

临时搬迁- 2023-24学年和2024-25学年

蒙特莱克小学已经搬迁到约翰马歇尔学校的临时地点, 520 NE Ravenna Blvd, 在施工期间.

时间轴

建设阶段图形显示学校正处于建设阶段
了解在这些项目阶段会发生什么
  • 预设计阶段完成
  • 方案设计完成
  • 设计开发阶段完成
  • 施工文件/许可阶段正在进行中
  • 投标和授予阶段完成
  • 施工中
  • 学校于2025年秋季开学

当前的设计

这些图片展示了建筑师对新学校外观的设计.

建筑师设计的一个大的室内空间,有一个舞台和一些圆桌
对公地和舞台的潜在看法- 2022年10月
带有庭院的u形建筑的平面图
拟建建筑物及现有建筑物的地盘图则- 10月. 2022
建筑师绘制的带有人行道和花园的砖砌建筑
新入口的建筑师图纸- 2023年6月
建筑师绘制的带有庭院和操场设备的砖砌建筑
2023年6月,游戏区域的建筑师图纸

项目进展

里程碑达到-封顶仪式

Placing the final beam on a steel structure is celebrated as the “topping out” of a new building. The topping out ceremony for the new addition at 蒙特莱克小学 took place on Thursday, 3月. 7, 2024. 照片和视频如下.

两个人站在一个钢架结构上
钢铁工人等待最后一束-三月. 7, 2024
a person in a safety jacket and hard hat leans forward to write on a white painted steel beam
项目经理保罗·怀特在最后一根横梁上签字. 7, 2024
a short person and a tall person wear construction safety vests and hard hats while standing in front of part of a steel beam painted white. 横梁上写着“谢谢SPS的选民,茱莉亚·皮尔森”
Montlake Principal Julia Pearson and Capital 项目 and Facilities Director Richard Best at beam signing – 3月. 7, 2024
2 people stand on a red, white, and blue beam on one corner of a steel framed structure. 他们在握手. 一端是常青树,另一端是美国国旗.
最后一根梁就位时的祝贺握手-三月. 7, 2024
2个人在顶部的钢结构两侧各搭一个红色, 白色和蓝色的横梁上有一面美国国旗和一棵常青树
钢铁工人把横梁装到位. 7, 2024
a steel beam is being slung into place at the top of a steel framed building by a crane . 两个人在现有结构的顶部等待
在最后的光束中飞行. 7, 2024
a group of people in construction safety vests and hats stand in front of a steel beam with a steel framed structure behind
项目人员与最后的光束- 3月. 7, 2024

观看最后一根钢梁安装到位的视频.

视频直播

相机1

照相机2

建筑的照片

砖房与新楼形成L形的建筑工地. 新楼的另一端是一座尚未完工的大楼
Looking north with the new addition at the top and the historic building to the right – May 2024
砖房与新楼形成L形的建筑工地. 新楼的另一端是一座尚未完工的大楼
Looking east with the concrete blocks for the gym being installed in the lower right – May 2024
前面有空间的混凝土砌块墙
新体育馆将于2024年5月建成
interior of a partially built wall and ceiling with a stairway being built by 2 workers
新建的内部楼梯- 2024年5月
正在扩建的砖房的天线图. 你可以看到背景中有一片水域
向西眺望,前景为地标建筑- 4月. 2024
一幢被街道包围的在建大楼
除了房屋管理,教室和图书馆-四月. 2024
part of a large building under construction with the second floor sticking out much further than the framed building and 3rd floor
室外学习平台上的增加- 4月. 2024
在建建筑旁边的混凝土基座和木框架
体育馆混凝土基础和形式- 4月. 2024
aerial view of a construction site with a brick building to the right and a new building being constructed at a right angle attached to it in the upper part of the photo. 灰尘和施工设备在剩余的空间
向北看,钢铁和金属甲板安装到位- 2024年3月
aerial view of a construction site with a brick building at the top and a new building being constructed at a right angle on the left side. a foundation is in progress in the lower right corner of the site 灰尘和施工设备在剩余的空间
体育馆地基正在建设中,右下,2024年3月
湿混凝土覆盖了钢框架建筑的地板. 使用安全设备的工人正在打磨混凝土
混凝土甲板浇筑在第三层- 2024年3月
metal framing and wallboard in a hallway with copper pipes running across the ceiling space
Metal stud framing, wall board, and utilities on 2nd floor of landmarked building – 3月ch 2024
aerial view of a construction site surrounded by streets and houses with a lake and a stadium in the distance
望北与赫斯基体育场在背景- 2月. 2024
aerial showing a rectangular brick building with construction happening behind it including a crane
Looking east with the landmarked building in the foreground and the new steel structure in progress behind – Feb. 2024
一间长长的房间,露出椽子,几扇窗户旁边有一面水泥墙
地标建筑抗震升级的混凝土剪力墙- 2月. 2024
a steel framework for a 3 story building with a crane partially showing in the foreground
新建筑的钢结构安装- 2月. 2024
aerial view of a construction site with a brick building at one end and a view of a lake in the distance
西北方向的鸟瞰图- 12月. 2023
at brick building with boarded up windows sits in a construction site with a concrete wall in front
12月,历史建筑西侧混凝土挡土墙完工. 2023
an excavator sites on dirt with a trench that has wide concrete forms with rebar and concrete pump nozzle leading into it.
泵送混凝土到钢筋混凝土基础形式- Dec. 2023
钢筋壕旁边的砖房
混凝土模板工作和新基础的钢筋安置- 11月. 2023
建筑物旁边的建筑工地鸟瞰图
2023年10月鸟瞰图
砖房的窗孔和旁边的建筑都是用木头做的
历史建筑旁新立足点的混凝土形式和钢筋- 10月. 2023
inside of a building partially torn up with posts and beams with some windows covered in wood and some open
地标建筑一层内部拆除- 10月. 2023
外墙正在施工的砖房
支撑学校现有的西侧- 9. 2023
地面上有材料的建筑工地
建筑南侧挖掘- 9月. 2023
一栋两层砖砌建筑的顶层有窗户. 挖掘机正停在它下面的水泥地上,水泥地只剩下两面墙. 混凝土旁边有个垃圾箱
Demolishing the old gym where it attached to the landmarked building – August 2023

建设更新

进度更新公布了前一个月.

2024年5月- 6月

  • The gymnasium concrete block construction continued in May and will be complete in June.
  • The exterior stud framing and sheathing continues on the addition and roofing work began.
  • Interior work continues in the existing building and addition including utility rough in and wall board.
  • 外部砌筑工作将于6月开始.

社区参与

你可以随时向 大家一起说. Select Montlake Construction to ensure it comes directly to the Montlake project team.

基本建设项目及规划, 建筑公司, 并最终, the construction team use multiple opportunities to share information and collect 反馈 on school construction projects. about the engagement done during the two-year planning process for the Montlake 小学 modernization and addition project.

学校设计谘询小组(SDAT)

在设计过程的早期, 来自学校社区的代表聚集在一起,形成学校的SDAT. sdat通常包括学校和地区的工作人员、家长和社区成员. 学生有时被包括在整个或部分过程中. 项目施工经理也参与其中. 了解更多关于蒙特莱克小学SDAT的信息.

项目团队

设计公司: 经销商集团

总承包商/建筑管理公司(GC/CM): 在建

项目预算: $64.800万年

资金来源: 建筑卓越V (BEX V)资本税,于2019年由西雅图选民批准.

项目经理保罗·怀特, pdwight@gimmemoon.net, 206-252-0648